Qinzhou developed a concrete embankment engineering vibration one machine

<

In order to further speed up the management of small and medium-sized rivers, ensure project quality and improve construction efficiency, the Water Affairs Bureau of Qinzhou District has established a group of concrete embankment construction equipment and construction process improvement research team led by Secretary Liu Shuwen. After repeated trials, The QSW-AI concrete embankment project has been successfully developed. It has also conducted a construction test on the site of the embankment of the Pingshuogou section and has achieved good results. Compared with the original construction machinery, this machine has many advantages such as labor saving, time saving, neat and beautiful appearance of the project. At the same time, it has the characteristics of simple operation, simple and clear construction process, high construction quality and fast project progress.

In accordance with the inspection report of the Special Inspecting Group of the Small and Medium Rivers Project of the Ministry of Water Resources on the project of the management of small and medium-sized rivers in our province and the letter from the Minister of Water Resources, Kang Guokai, to the director of the relevant city (prefecture), “The spirit of the letter of the rectification of problems existing in the dike project”. On June 11th, the Water Affairs Bureau presided over the emergency meeting of the city’s water conservancy construction management by the Director-General Bo Haiming, and put forward rectification measures. On June 24th, the city’s water conservancy project construction management meeting was held in Qin’an County to observe the vibrator construction method of Qin’an County embankment. The county’s water administration department was required to regulate the construction management of the project, further improve the construction process, and try to take measures. New methods and new processes improve project quality. After Qin’an on-site meeting, leaders of Qinzhou District Committee and District Government attached great importance to it. The main leaders visited the construction site in person. The District Water Affairs Bureau established the Construction Equipment and Construction Process R&D Improvement Task Force to improve and develop the concrete construction technology and construction equipment of the embankment project. .

After several trials, the Qinzhou District Water Affairs Bureau has successfully developed a QSW-AI concrete embankment anti-vibration machine. The machine is mainly used for the construction of embankments on concrete embankments. Its components are mainly composed of vibrators, flat plates, and electric hoists. , Electric trowel, control operator consists of five parts. The concrete size of the embankment anti-vibration unit is 2.7M in length and 0.8m in width. The height of the machine is 0.8m and the weight is about 200KG. The machine is equipped with an electric control operator with two-way movement control and phase-change switch. The power used is 3 phase power, all-in-one machine in the vibration, smoothing, lifting at the same time the maximum power of 2.2KW. At the same time, in the absence of power, each one is equipped with a 5.5KW generator, which can be used to move the motor up and down and control the vibration of the concrete. The machine is also equipped with a power trowel, which can smooth the concrete embankment to achieve a flat and beautiful appearance.

SSS Non Woven

SSS Non Woven,Nonwoven Fabric Price,SSS Non Woven Fabric,Non Woven Fabric Roll

Zhejiang Changxing Vashinor Machinery Company , https://www.vashinor.com