Nickel Based Laser
Cladding Powder
Ni base alloy
powder is mainly made of NiCrBSi or NiBSi. Ni-based self-fluxing powder has
good wettability, corrosion resistance and high temperature self-lubricating
effect, and is used in components with heat resistance, corrosion resistance and
thermal fatigue resistance. In general Ni35,Ni45,Ni60 etc can be used for laser
cladding, the No means hardness of powder. Inconel 625 and 718 has good
corrosion property under higher temperature, also widely used for laser
cladding process.
Cobalt based Laser
Cladding Powder
Cobalt-based alloy
powder is the cemented carbide resistant to various types of wear and corrosion
as well as high temperature oxidation. That is, the so-called
cobalt-chromium-tungsten (molybdenum) alloy or Stellite alloy cobalt-based
alloy is mainly composed of cobalt, containing a considerable amount of nickel,
chromium, tungsten and a small amount of molybdenum, niobium, tantalum,
titanium, Alloying elements such as lanthanum, and occasionally a class of
alloys containing iron.
Co-based self-fluxing
alloys have good high temperature performance and wear resistance and corrosion
resistance, and are used in petrochemical power, metallurgy and other
industrial fields where they are wear-resistant, corrosion-resistant and
high-temperature resistant.
Iron based Laser
Cladding Powder
The work pieces
required for laser cladding and manufacturing in the actual industry are mainly
carbon steel and cast steel. The Fe-based alloy is close to the base material
in composition and has good wettability. The advantage of Fe base powder is
lower cost and good wear resistant of cladding layer. As a result, it`s the
most widely used for laser cladding process. It is suitable for parts that
require local wear resistance and are easily deformed.
WC blended Laser
Cladding Powder
Tungsten carbide blended with Ni alloy powder is the best
choice for wear resistant work piece. This unique process can bring excellent
wear, corrosion and high temperature resistant. Our blend powder can achieve
different portion of WC from 35% to 60% without crack under suitable cladding
parameter.
Iron Alloy Powder,Nickel Alloy Powder,Cobalt Alloy Powder,Laser Cladding Powder Luoyang Golden Egret Geotools Co., Ltd , https://www.xtclasercladding.com
The 330 kV copper pool line has a total length of 2 × 28.6 km, spanning Tongchuan and Xianyang. This line operation actively promotes the use of new technologies and new processes. It has adopted the new technology of 2×LGJ-720 large-section wire for the first time in the 330 kV system of the Northwest Power Grid, achieving breakthroughs in 330 kV large-capacity transportation. The Shaanxi Power Transmission and Transformation Engineering Company, which is responsible for the construction, faces the complicated environment of large compensation for young crops, high engineering and technical difficulties, and changing weather. Under the active coordination of Xianyang Power Supply Bureau and Tongchuan Power Supply Bureau, the construction organization is strengthened to overcome the difficulty of construction. Difficulties, since the start of February this year, lasted more than 5 months, more than 900 power workers took high temperatures, fighting the heat, adhere to civilized construction, strict quality control, successfully completed the construction tasks, to ensure that the project was successfully put into operation on schedule.
Shaanxi company will further accelerate the construction of supporting projects for Tongchuan Power Plant. At present, 330 kilovolts of Chiyang-Dayang Shuanghui, Chiyang-Taoqu 2 and Dayang-Zhuangtou double transmission lines are under construction. It was completed and put into operation before November this year. By then, the 2×600MW capacity of Huaneng Tongchuan Power Plant will be delivered smoothly, which will greatly meet the electricity demand of various load center cities in Shaanxi Guanzhong.
Shaanxi 330 kV copper pool double return line successfully put into operation
Recently, the 330kV Tongchuan Power Plant to Chiyangyang Double-circuit Line Project in Shaanxi was successfully put into operation. As the first project of Shaanxi's “Eleventh Five-Year†power grid development plan, Zhongguan Tonghua Power Plant is responsible for the power transmission task of Huaneng Tongchuan Power Plant. Its smooth operation has positively promoted the construction of Guanzhong Foreign Ring Network in Shaanxi Province. .