Directly hit the six "pain points" in the hoisting industry

<

Difficulties in hoisting: The equipment is installed inside the factory. The width of the factory door is only 3.2 meters, the height is only 3.3 meters, and the height of the 50 ton car is more than 3.6 meters. If you do not remove the door, you can't enter it.

痛点一:高度受限,普通吊车“进不了门”
Pain point 1: height is limited, ordinary cranes can't enter the door

Implementation of hoisting equipment: Xugong XGC55T telescopic boom crawler crane boom is flat, with a height of only 3.1 meters, easy to complete the "entry" task of the plant.

Difficulties in lifting: Box beams of hoisting bridges on dams temporarily laid in river courses. The dam is only 5 meters wide and the box beams need to be moved laterally. Ordinary car hoisting legs have a width of more than 7 meters, and can not meet the needs of lateral movement. Ordinary crawler cranes, the environment is too narrow to complete the boom installation.

痛点二:环境狭窄,普通吊车“伸不开腿”

Pain point 2: The environment is narrow, ordinary cranes can't stretch their legs.

Implementation of hoisting equipment: Two XCMG XGC55T telescopic boom crawler cranes were used for lifting. Xugong telescopic boom crawler cranes can be hoisted without the need for legs. It can easily cope with the narrow lifting environment and can walk during the lifting process to complete the bridge installation task efficiently and smoothly.

Difficulties in hoisting: A yacht with a value of nearly 10 million is stranded on the beach. Because the ground is so soft that it can't stand the tire rolling, ordinary cranes can't enter the venue. Even if you drive in, it is difficult to hit the legs. It is more likely "Deep into it, can't extricate yourself."

痛点三:松软、泥泞地面,普通吊车“不能自拔”

Pain point three: soft, muddy ground, ordinary crane "can not extricate themselves"

Implementation of hoisting equipment: XCMG XGC55T telescopic boom crawler crane adopts crawler walking mode, which has the unique “classified counterweight performance” in the industry. It can choose the counterweight according to working conditions, greatly reducing the grounding specific pressure, in muddy, swamp, Beach construction is also easy.

Difficulties in hoisting: installing water pipelines in the mountains of Nepal requires “over the mountains” to reach the construction site. In the face of uneven mountain terrain, the legs of ordinary cranes do not have stable support points, which are “unsatisfactory”. Caution can also cause a rollover accident and the safety factor is greatly reduced.

痛点四:地势陡峭,普通吊车“站不稳”

Pain point four: the terrain is steep, the ordinary crane is "unstable"

Implementation of lifting equipment: XCMG XGC25T adopts the same steel three-strand track plate with excavator, which is solid and wear-resistant, has strong grip ability, and has a strong walking system. It is also flat in the face of various mountains, ravines and rivers. Even a variety of steep slopes can be easily handled.

Difficulties in lifting: The power distribution cabinet of a power station is hoisted and moved frequently in the construction site. When lifting the crane, the ordinary crane must first extend the outriggers and adjust the level before working. It is impossible to achieve walking and hoisting.

痛点五: 边行走,边吊重,普通吊车“动不了”

Pain point 5: Walking while hanging, ordinary cranes can't move

Implementation of hoisting equipment: XCMG XGC55T telescopic boom crawler crane can be carried with load in low speed mode. When it is necessary to repeatedly move the position of the machine, it can also easily lift heavy objects and easily realize short distance hoisting transportation.

Difficulties in hoisting: When the operation is transferred, the ordinary crawler crane needs multiple large flatbed trucks for transportation. Before the transportation, the truss boom should be dismantled and disassembled. After reaching the construction site, it can be reassembled, which is time-consuming and costly.

痛点六:轻装上阵,普通吊车“耗时费钱”

Pain point six: lightly loaded, ordinary cranes "time-consuming and costly"

Implementation of hoisting equipment: Xugong XGC25T telescopic boom crawler crane, only need one transport vehicle to realize the whole machine Transfer. After reaching the construction site, directly open the flatbed truck, extend the crawler chassis and boom, and start work, greatly reducing assembly time. Reduce costs and be cost effective. (This article comes from Xugong lifting)

Related News: Xugong Lifting Crane Innovation

Garden Flag

We equipped with advance automatic screen printing machine, inkjet screen making machine, autowashing & heatsetting machine which allow us to make the Flag size up to 2*6 meters with 7 colors. Our factory occupy the area of 3000 square meters, employ about 200 works,provide the production daily capacity for 12000 ~15000 square meters. To protect the environment,we also build the water recycling system according to the standard of national environment protection. With the reputation of products quality and creditability since settled, we have made the project of supplying flags for: the 10th national Games of china, the world table-tennis Championships, 2004 Athens Olympic games, 2008 Euro-Championships, 2008 Beijing Olympic Games and Vancouver 2010 White Olympic Games. As a leading manufactory certificated by ISO9001 in china,we are known as the best quality, the reasonable price, and the fastest delivery. Now our products already exported to all around world ,such as:Germany , Sweden , Switzerland, Belgium, Iceland ,Canada, Australia ,USA,UK,UAE,HongKong an Macao. We will always assure of you to provide the best quality and service. Welcome to contact us,for any question, in any time!

little pumpkin banner,pumpkin patch banner,pumpkin pie banner,welcome little pumpkin banner

FlagKing Flags Manufacturing Co.,Limited , https://www.cnflagking.com