Concrete pumping four characters

<

Construction irrigation concrete, pumping active, proper process, mastery;

Preparation, pumping, cooperation, closing work, step by step, often successful.


ready:

Check to work, the whole machine intact, mixing hopper, foreign body emptying;

Inventory tools, according to chapter refueling, the main oil unloading, electric door opened.

Standby operation, careful observation, clear movements, key lubrication;

Shutdown power, unloading handling, warning safety, waiting to start.

Pumping:

Guide cloth tube, be sure to kiss, pump tube connected, not plugging loose;

Level with the right, a matter of fact, pump water slurry, pulp thick easy to pass.

Uniform command, failed to pass avoidance, slow steady, pumping smooth;

Stop pump timely, before and after the convergence, taking the time to check, be prepared.

Cooperation:

Irrigation construction, pumping center, echoes before and after blocking;

Do not block fast, do not panic only pass, see material pump, pump in all.

Case of no urgency, clear thinking, find out the reason, clever clears up;

Elbow easy to block, cone pipe difficult, shut down too long, good vibration.

Leakage separation, fastening pipe card, stop pump sabotage, timely anti-pumping;

Pipeline is too long, to be fixed, broken pipe, pump back pumping.

Broken tube connected, timely exhaust, safe operation, should not be stormed;

Pump is dead, people need well-informed, full knowledge, everything is easy.

knock off:

Pumping is completed, did not forget the pump, pipe cleaning, operation stress;

Disconnect the pump port, flushing equipment, piston refueling, lubrication open up.

Repeatedly check, stop unloading, fill in the form realistic, shut down and shut down;

Pumping method, from practice, promotion should be, improve and improve.

Auto Home And Tools

Auto Home And Tools,Auto Home

TSRIpromo has sourcing , https://www.tsripromo.com