High Accuracy Floor Decking Roll Form Machine Manufacturers
Why choose this machine?
1. Designed by 15 years experienced R&D members with lifetime seivices
2. Introduced Mitsubishi PLC with touch screen.
3. Need only one worker (minimum) to operate
4. Roller cover with 0.05mm chrome, ensure lifetime>10years
5. Cr12 mould steel cutter with quenched treatment. Blade with heat treatment.Â
6. Product cut-to-length.
Technical parameter
Item
Specification
Â
Raw MaterialType
Pre-painted steel coil & galvanized coils
Thickness(mm)
0.8-1.2
Yield strength(mpa)
235-345
Roller material
45# steel , coated with ChromeÂ
Shaft for rollersÂ
Solid shaft with 82mm,processed with cylindrical grinder
Forming speed(m/min)
12
Speed adjusting mode
Mitsubishi frequency transformer
Roller drive                                              Â
Decelerating motor + Chain drive
Cutting mode
Hydraulic cutting
Cutter materialÂ
Cr12 mould steelÂ
Length measurement
Nemicon Encoder
Control mode
 Mitsubishi PLC
Operating mode
Button + Mitsubishi Touch screen
Main motor power(kw)
18.5KW
Total power(kw)
24Â KW
Process flow
Decoiler -- Feeding & Guiding -- Roll forming---Hydraulic Cutting - product to run out table  Â
              Â
Components of machine
Â
Decoiler (manual decoiler and hydraulic decoiler for option)
1set Â
Feeding & guiding device
1set
Main roll forming machine
1set
Hydraulic cutting system
1set
Controlling system
1set
Run out table (auto. Stacker for option)
1set Â
Â
We customize your machines!Â
Â
To customize machine, we would love to know:
1. Profile drawing
2. Raw material: the width(1250mm?), thickness(0.3-0.7mm?), and yield strength of steel coil.
3. Voltage: designed per your requirement
4. Configuration requirement: Hydraulic or manual decoiler/ stacker
Â
Have no idea about them?Â
We will be glad to recommend the lacol popular profile for you----Just let us know your country!
Why us?
1. Â Customize roll forming machines since 2003.
2. Â Capacity: 12-15 sets/monthÂ
3. Â Delivery: in only 5-8 weeks for urgent orderÂ
4. Â Company occupies 6650, in which 5650 for workshops
5. Â Have our own tool center. 12 sets CNC machines.
6. Technician can be sent to your factory to install the machine and train your workers
Â